Name : _________________ |
||
|
If Ann does a job in 7 days, and Bob does it in 8 days, how long do they take together? (Nearest to the 10th...) |
If Ann does a job in 2 days, and Bob does it in 9 days, how long do they take together? (Nearest to the 10th...) |
|
+( ) |
|
( )+ |
|
++[[ ]]++ |
||
| 743 3.7 4.5 1.9 3.6 3.2 ( 16.9 ) 1.6 1.2 2 3 2.8 ( 10.6 ) [[ 27.5 ]] | ||
|
|
||